Free webinar
Zero-Rework Electrical Closets
The Kickoff Checklist
Dec 5 @ 1:30 pm EST | Location: Virtual (Register below to get the Zoom link)
🔧 What We’ll Cover (Full Checklist)
1. One-Line Review
Feeder schedules, conduit size + quantity
VE impacts to conductor type + conduit sizing
2. Underground & Duct Bank Requirements
Minimum depths, encasement, spacing, material changes
Coordination with ECs on sizing + constructability
3. Approved Submittals & Clearance Zones
Why approved submittals must be in place before modeling
Gear landing zones, top/bottom clearances, lug locations
4. Equipment & Panel Considerations
Panel lug orientation, double-tub connections, Unistrut framing
Grounding bar, sleeves, and support requirements
5. Conduit Routing
Early routing guidance: size, quantity, preferred paths
Rack width, height, spacing, and prefab viability
Rack weights, rod sizes, and structural load coordination
6. BIM Modeling Requirements
LOD expectations + what must be modeled
Family data needed for BOMs, assemblies, and prefab workflows
7. Prefab Needs
Detail required for spool drawings + assembly success
Conduit material types, rack sizes, and shipping/installation considerations
💡 Why Attend?
You will walk away with:
A proven kickoff checklist that dramatically reduces electrical-closet rework
Alignment across design, VDC, prefab, and field teams
Better clarity on what needs to be known before modeling
Higher accuracy in BOMs, panel connections, routing paths, and prefab outputs
Practical, field-validated standards used by leading ECs and VDC teams
This is tactical, actionable knowledge — not theory.
👤 Who Should Attend
This session is ideal for:
VDC Managers & Coordinators
Electrical Detailers & Designers
BIM Leads
Prefab Managers
Project Engineers
Field Supervisors
Anyone responsible for modeling accuracy, routing decisions, or reducing rework
Save Your Spot!
🖱️ Register below to secure your spot and receive the Zoom link.



