Free Case Study

All Star Electric’s Success Story

With EVOLVE Shop, every project stakeholder can now see: What’s scheduled, What’s behind, What’s waiting on material, What’s completed, What’s missing, What’s ready to ship.

The support, the listening, and the integration of what my team asks for has been by far the best of any company we’ve dealt with, period.”

Before EVOLVE

  • Disconnected systems, Missing information, Constant calls & interruptions, No visibility, Shop delays, Tool fatigue and no trust in software.

After EVOLVE

  • One platform for design, prefab, and material flow, Total visibility across teams, productivity gains, Clear material routing, Faster project delivery, Fewer mistakes and fewer interruptions, and a long-term partner invested in their growth.


All Star Electric now operates with speed, clarity, and confidence, powered by a streamlined VDC-to-prefab workflow built with EVOLVE.

Download now!

Get instant access to All Star Electric’s Success Story

EVOLVE logo

Copyright 2025 EVOLVE MEP. All rights reserved.

EVOLVE logo

Copyright 2025 EVOLVE MEP. All rights reserved.