Free Case Study

Rex Moore’s Success Story

EVOLVE streamlines prefab workflows with greater visibility into what’s scheduled, what’s fabrication-ready, what’s actively being installed, and what’s completed across the shop and field.

“

“

“EVOLVE gives the team the ability to provide accurate, efficient drawings, models, to save labor hours in the field.

Rex Moore combines more than 100 years of industry experience with a modern, lean approach to electrical construction that emphasizes efficiency, accuracy, and prefabrication. By leveraging standardized designs, point-of-use packaging, and prefab-ready assemblies, the company streamlines workflows, reduces rework, and improves both safety and project delivery. This operational philosophy places a strong demand on the VDC/BIM team to create highly accurate, construction-ready models that support field installation and fabrication efforts. According to VDC/BIM Manager Ken Hedrick, EVOLVE has helped Rex Moore accelerate modeling workflows while providing the detailed, manufacturer-specific content needed to confidently move from design to prefab and installation.

Rex Moore teamed up with EVOLVE to improve their process with:

  • Lean manufacturing principles drive approach to electrical construction and prefab workflows.

  • VDC/BIM models are expected to support real-world installation, not just coordination.

  • Speed and efficiency in modeling are critical to meeting complex, schedule-driven project demands.

  • Accurate, manufacturer-specific components are essential for successful prefab and field execution

Download now!

Get instant access to Rex Moore’s Success Story

EVOLVE logo

Copyright 2026 EVOLVE MEP. All rights reserved.